Project Establishment and Delivery

City of Oshkosh, Wisconsin, rail centralised traffic control

This railway signalling project provided coded track circuits and remotely controlled signalling through the city of Oshkosh including the Fox River swing bridge and numerous level crossings.

  • Design and logic programming of new signalling equipment.
  • Arranging construction and installation including liaison with Army Corps of Engineers re provision of a submarine cable across the Fox river.
  • Testing and commissioning of the completed signalling system.
Project Establishment and Delivery

Index Previous Next



© Copyright - Site map
Wellington New Zealand

Website Builder - Website World